ID | Description | Date taken | Date upload |
---|---|---|---|
102 | The fourth part of the video from our rail trip to Sweden in June 2006. We started in Billingsfors where the T44 386 has just arrived from Göteborg. The (un) loading of the wagons on the loading area is in process as the T44 is putting the right wagons on the right tracks. I was invited in the cabin for the train ride to Mellerud and we depart for Åsensbruk where the factory gets some wagons. It moves the wagons alongside the loading dock using a winch. After that we leave for Mellerud and drive on to Göteborg where the arrival on the big yard was an impressive sight. |
Around 01-06-2006 | 09-12-2012 |
Details | ||||
---|---|---|---|---|
Country
|
Place
|
Powersupply
|
Train/Engine
|
Operator
|
Track
|
Subject
|
Type
|
Owner
|
Social media
|
Description | |
---|---|
The fourth part of the video from our rail trip to Sweden in June 2006. We started in Billingsfors where the T44 386 has just arrived from Göteborg. The (un) loading of the wagons on the loading area is in process as the T44 is putting the right wagons on the right tracks. I was invited in the cabin for the train ride to Mellerud and we depart for Åsensbruk where the factory gets some wagons. It moves the wagons alongside the loading dock using a winch. After that we leave for Mellerud and drive on to Göteborg where the arrival on the big yard was an impressive sight. |
|
Date taken | Date upload |
Around 01-06-2006 | 09-12-2012 |
Details | Country
|
Place
|
---|---|
Powersupply
|
Train/Engine
|
Operator
|
Track
|
Subject
|
Type
|
Owner
|
Social media
|